![](https://www.epfl.ch/labs/cclab/wp-content/uploads/2018/08/Splash_project3_Verdasio-copy.jpg)
Intragna, Switzerland, 1999-2000
- Strengthening of the two-span prestressed concrete box girder with four CFRP cables
- External cables inside the box girder in a polygonal path over the 69-m length of the bridge
- Cables accessible at any time for examination or replacement
- Corrosion-resistant strengthening solution
- Monitoring of the load in the pre-stressing CFRP cables. Very small relaxation and negligible long-term losses in the pre-stress force
Reference
Warning
Please note that the publication lists from Infoscience integrated into the EPFL website, lab or people pages are frozen following the launch of the new version of platform. The owners of these pages are invited to recreate their publication list from Infoscience. For any assistance, please consult the Infoscience help or contact support.