Basic principles
Real estate assets and infrastructure fall under the responsibility of the Vice Presidency for Operations (VPO), which includes in particular the Domains of Development and Construction (VPO-DC) and Safety and Facilities Management (VPO-SE). The VPO ensures the preservation of functional value through construction, renovation, and transformation projects, as well as maintenance work, in order to meet the specific needs of the EPFL community.
Outdoor facilities are also managed within these two domains, including road maintenance, green spaces, and parking management.
VPO-SE is responsible for all services related to:
- Logistics support (caretaking, cleaning, printing and reprographics, audiovisual services);
- Facilities management (technical and repair services, infrastructure renovation and maintenance).
Responsabilities
The VPO-DC and VPO-SE are the only bodies authorised to perform any work related to EPFL infrastructure.
Any alterations in infrastructure required to meet the needs of users shall be requested through the “Intervention request” web portal (website in French only). These requests are reviewed and, if approved by the relevant bodies of the VPO, the work is ordered and monitored by project managers competent in the required fields.
Requests for removals or furniture are likewise processed via a “Intervention request”. Only the VPO-DC and VPO-SE departments have the authority to purchase furniture, based on a standard model catalogue. Specific requests will be considered and accepted only in exceptional and fully justified cases.
Services related to scientific equipment are under the responsibility and at the cost of the Schools and units concerned. Connections to infrastructure are also covered by the equipment purchase credits, but their execution falls under the responsibility of the VPO-DC and VPO-SE domains and must be the subject of a intervention request.
The assembling and dismantling of equipment, as well as their packing and removal, are the responsibility of the Schools. The VPO-DC and VPO-SE departments act as a coordinator only where such interventions are related to the layout of premises under its responsibility. When moving, EPFL employees and members of teaching staff are responsible for vacating and cleaning the premises before handing them over. If applicable, any costs incurred will be charged to those units responsible.
It is the responsibility of EPFL members to make their requests at an early stage so that services may be provided within the necessary timeframe. Calls for tenders and ordering procedures may take 8 to 10 weeks before delivery (and longer with certain suppliers during holiday periods).
The Project Management Office (PMO) within the VPO-DC domain is responsible for EPFL’s single, official database of rooms and floor areas. The use of parallel databases is strictly prohibited. Faculties and other users must keep their room usage documentation up to date, either via the tools available to Infrastructure Managers or by directly reporting changes to the PMO.
The assignment and allocation of rooms are governed by the PMO. The management of faculty space perimeters is delegated to the Faculties/Colleges; however, in accordance with applicable rules, ultimate authority over these spaces lies with the VPO, on behalf of the EPFL Direction.
The PMO is also the only unit authorized to sign lease agreements on behalf of EPFL.
Further informations
The “Real Estate and Logistics” web page provides information about services, placing intervention requests and the necessary contact details for any repairs.
Cadre juridique
- LEX 7.1.0.1 “Ordonnance concernant la gestion de l’immobilier et la logistique de la Confédération”
- LEX 7.1.0.2 “Directive concernant la gestion immobilière du domaine des EPF”
- LEX 7.1.0.3 “Règles de cofinancement pour les projets de construction du domaine des EPF selon le NMC”
- LEX 7.3.1 “EPFL Directive on Mobile Telephony”
- LEX 7.5.1 “Rules and Regulations governing Parking at EPFL – Lausanne”
Advice for day-to-day business
The project leaders from the Development and Construction Department (VPO-DC) and the Security and Operations Department (VPO-SE) are available to advise EPFL members on issues regarding moving, construction and technical issues. A request via a intervention request form is the best way of directing and providing an optimal response to your needs.
Contact
Franco Vigliotti
Director of the department of Development and Construction
Phone 021 693 20 96
[email protected]
Eric Du Pasquier
Director of the department of Security, Safety and Facilities Operations
Phone 021 693 20 11
[email protected]